The High-Rise Problem
Anything above the fourth or fifth floor traditionally requires swing staging, bosun chairs, or suspended scaffolding. These methods are expensive — $5,000 to $15,000+ per mobilization just to set the rigging before the cleaning starts. They're slow: days of setup before any work happens, and floor-by-floor work after that. They're disruptive: scaffolding blocks windows and views for tenants, hotel guests, and condo owners while it's up.
And they're dangerous. Falls from height remain the leading cause of fatal injury in commercial cleaning. In 2022 alone, two window washers died in separate falls from San Diego buildings doing work that drones now handle from the ground. The risk profile is the entire reason this company exists.
How Drones Change the Equation
Four metrics property managers and facility teams actually budget against.
Setup
Cost
Risk
Speed
What We Reach
Five vertical surfaces and rooftop targets traditional rigs require separate mobilizations to access. Our drone reaches all of them in one visit.
Windows up to 27 Stories
Standard rig services every floor of typical Class A and Class B high-rise envelopes — about 200 ft of vertical glass.
Facade Washing
Stucco, EIFS, glass curtain wall, metal cladding, ACM panels, brick, and stone — chemistry tuned to the substrate.
Rooftop Equipment
HVAC condensers, mechanical penthouses, satellite arrays, and antenna mounts cleaned without the equipment shutdown a swing-stage rig requires.
Commercial Solar Arrays
Rooftop and parking-canopy solar on commercial high-rises restored to nameplate output with pure DI water.
Canopy & Porte-Cochere Tops
Hotel, hospital, and office-tower entry canopies that ground crews can't reach without lifts blocking the drop-off.
Property Types Served
Hotels & Resorts
Sky-bar and view-floor glass, oceanfront salt-fog elevations, and rooftop pool decks. No scaffolding blocking guest sightlines.
Residential Condos & Apartments
Multi-tower communities, view-tier units, and HOA-governed buildings. Unit owners can opt-in for personal services during community visits.
Office Towers
Class A office, mixed-use, and convention-adjacent towers. Drone-flyover assessment replaces in-person walkthroughs.
Mixed-Use Developments
Retail-on-bottom + residential or office above. Tenant-friendly off-hours scheduling.
Hospital & Medical Towers
Patient-facing glass, helipad-adjacent rooftops, and clean-room exterior glazing. Coordinated with infection-control schedules.
Built Around the Real Risk
Every operational standard exists to keep workers off the building.
FAA Part 107 Compliance
Every flight at altitude or near controlled airspace files LAANC authorization. NOTAMs published when required by airport proximity.
$2M Aviation + $2M GL
Aviation liability covers drone operations; general liability covers the cleaning work and any contact damage. COI to property managers in advance.
No Workers at Height
Falls from height remain the single largest cause of fatal injury in commercial cleaning. Eliminating workers at height eliminates the underlying risk.
Request a Tower Quote
Send us the building address and target floors. We'll send back a written bid with line-item pricing, COI, and a recurring-route option — usually within one business day.
Commercial Quote
No obligation. John reviews every commercial request personally — COIs, W-9s, and references available on request.
